# The Simulations → AI interface — draft for the November session
|
||
|
||
| | |
|
||
|---|---|
|
||
| **What this is** | Our side of the handover the Project Manual calls "the environment interface": what the agent sees, what it controls, how it is scored. Written by the RL Environment seat; to be finished jointly with Simulations' Simulation Core Developer early in Q2 and frozen before Christmas |
|
||
| **Where it lives in code** | `aicontrol/env/spaces.py` builds the spaces from `configs/env.yaml`. Run `uv run python -m aicontrol.env.spaces` to print the current layout |
|
||
| **Grown from** | The manual's interface list (section 3.2) and our older Simulator I/O sheet, whose names we keep where they exist |
|
||
| **Status** | Draft, 11 Sep 2026. Everything marked *to agree* is open until the joint session |
|
||
|
||
## The idea in one paragraph
|
||
|
||
The agent and the simulated hospital talk through a Gymnasium environment: `reset()` starts a
|
||
run, `step(action)` advances five minutes and returns what the agent may see next, plus a
|
||
score. Simulations owns everything inside `step` (the physics, the KPIs); we own everything
|
||
outside it (the agent, the safety layer, the evaluation). The two only have to agree on three
|
||
lists, below. Until the twin exists, a placeholder environment with toy physics exposes exactly
|
||
these lists so our side can be built now.
|
||
|
||
## 1. What the agent sees
|
||
|
||
One flat vector of 64 numbers per step, laid out from `configs/env.yaml`. The first sixteen are
|
||
the present; the remaining 48 are the forecasts.
|
||
|
||
| # | name | size | unit | range | source |
|
||
|---|---|---|---|---|---|
|
||
| 0 | `time_of_day` | 2 | sin, cos | −1 … 1 | calendar |
|
||
| 2 | `time_of_year` | 2 | sin, cos | −1 … 1 | calendar |
|
||
| 4 | `P_PV` | 1 | kW | 0 … 460 | twin: solar output now |
|
||
| 5 | `L_tier1` | 1 | kW | 0 … 1000 | data: critical load now |
|
||
| 6 | `L_tier2` | 1 | kW | 0 … 1000 | data: essential load now |
|
||
| 7 | `L_tier3` | 1 | kW | 0 … 1000 | data: non-critical load now |
|
||
| 8 | `SoC` | 1 | fraction 0–1 | 0 … 1 | twin: battery state of charge |
|
||
| 9 | `H2_level` | 1 | kg | 0 … 200 | twin: hydrogen in the tank |
|
||
| 10 | `p_tank` | 1 | bar | 0 … 30 | twin: tank pressure |
|
||
| 11 | `price` | 1 | currency/kWh | −1 … 5 | data: electricity price now |
|
||
| 12 | `CO2_int` | 1 | kg CO₂/kWh | 0 … 1.5 | data: grid carbon intensity now |
|
||
| 13 | `grid_on` | 1 | 0/1 | 0 … 1 | data: grid available |
|
||
| 14 | `ele_on` | 1 | 0/1 | 0 … 1 | twin: electrolyser running |
|
||
| 15 | `fc_on` | 1 | 0/1 | 0 … 1 | twin: fuel cell running |
|
||
| 16–63 | `fcst_<quantity>_<horizon>min` | 3 each | kW | 0 … max | forecaster: p10, p50, p90 for solar, tier1, tier2, tier3 at +60, +180, +360, +1440 min |
|
||
|
||
Why sin and cos for time: a clock hand, not a number that jumps from 23:59 to 00:00. Why
|
||
ranges: they scale the numbers for the network and let a test catch nonsense; they are not
|
||
physical guarantees.
|
||
|
||
*To agree with Simulations:* which of these the twin reports directly (tank pressure or only
|
||
kilograms; equipment state as on/off or as a mode); the forecast horizons and whether four are
|
||
enough; the load upper bound once the dataset scale is known; the currency.
|
||
|
||
## 2. What the agent controls
|
||
|
||
Four floats per step.
|
||
|
||
| name | range | meaning |
|
||
|---|---|---|
|
||
| `u_ele` | 0 … 1 | fraction of electrolyser rated power; 0 is off, anything below the minimum load becomes off |
|
||
| `u_fc` | 0 … 1 | fraction of fuel cell rated power |
|
||
| `u_batt` | −1 … 1 | fraction of battery max power; positive discharges, negative charges |
|
||
| `shed` | 0 … 2 | rounded to a shedding level: 0 nothing, 1 Tier 3 shed, 2 Tiers 2 and 3 shed. Tier 1 is never an option |
|
||
|
||
The grid is not an action: it absorbs whatever is left after the four above, within its
|
||
connection limit. Load shedding *is* an action here, as the manual lists it, but the safety
|
||
layer will refuse anything that would touch Tier 1.
|
||
|
||
*To agree with Simulations:* the shedding encoding (a continuous number rounded inside the
|
||
environment is the simplest thing that works with Stable-Baselines3, which cannot mix
|
||
continuous and discrete actions; the alternative is making all four discrete); whether the
|
||
twin wants setpoints in kW or in fractions; ramp limits applied inside the twin or reported
|
||
back as a clipped action.
|
||
|
||
## 3. How it is scored
|
||
|
||
The score per step is a weighted sum of the terms the manual lists. The *terms* are ours to
|
||
propose; the *weights* are agreed with Energy Management and Business, because they say how
|
||
much a euro, a kilo of CO₂ and a shed ward are worth relative to each other. The numbers in
|
||
`configs/env.yaml` are placeholders so that code can run.
|
||
|
||
| term | sign | what it measures |
|
||
|---|---|---|
|
||
| energy cost | − | money paid for grid electricity this step, minus money earned exporting |
|
||
| CO₂ | − | grid electricity used × carbon intensity |
|
||
| Tier 1 unserved | − − | any critical load not supplied; must dominate every other term |
|
||
| Tier 2 / Tier 3 shed | − | non-critical load cut, priced far below Tier 1 |
|
||
| limit violation | − | battery or tank pushed past a safe limit |
|
||
| switching | − | equipment turned on or off this step, to stop chattering |
|
||
|
||
*To agree:* whether a clipped action (the twin refused part of it) counts as a violation or
|
||
only as a reported difference; whether the perfect-knowledge benchmark and MPC are scored on
|
||
exactly this sum, so the comparison is fair.
|
||
|
||
## 4. What the twin must return so we can compute all of the above
|
||
|
||
Per step: served load per tier, grid import and export, PV used and curtailed, battery power,
|
||
electrolyser and fuel cell power, hydrogen produced and consumed, any limit clipping, and the
|
||
KPI increments. The manual's four KPIs (Self-Sufficiency Rate, Grid Dependency Ratio, Critical
|
||
Load Uptime, SoC Violation Rate) are computed by Simulations' KPI calculator; we read them,
|
||
we do not recompute them.
|
||
|
||
## 5. What happens when the twin replaces the placeholder
|
||
|
||
Nothing on our side, if the three lists hold. The training rig, the evaluation pipeline, the
|
||
safety wrapper and the dashboard all read the lists above, never the physics. That is the whole
|
||
point of drafting this now.
|